LBG Hydrogeologic & Engineering Services, P.C., a member of WSP (LBGHES), has completed a Comprehensive Water Supply Plan (Plan) for the City of Beacon (City). The Plan included evaluating the storage capacity of the three City reservoirs to estimate the safe yield of the reservoirs; conducting an extended yield test on the existing bedrock water-supply wells to determine the safe yield of the bedrock wells; conducting a groundwater exploration program at the City’s Pump House Road well field to evaluate the potential to develop a high yielding sand and gravel production well; and the evaluation of current and projected City build-out population to determine if the City has an adequate supply of drinking water to meet the current and projected water demand.

To read the water study, please click here.